Robson Ranch Improvements Phase I
Sector: Water Supply and Storage • Location: Denton, Texas, United States of America
Source: Dodge USA
Removal and replacement of the existing East Lift Station pumps, piping and controls. Blasting and re-coating of the existing East Lift Station wet well. Addition of a new backup generator, gravel drive and fencing. Removal and replacement of the Robson Ranch WRP UV System and integration of the new system. Temporary bypassing of East Lift Station and Robson WRP during Construction.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Removal and replacement of the existing East Lift Station pumps, piping and controls. Blasting and re-coating of the existing East Lift Station wet well. Addition of a new backup generator, gravel drive and fencing. Removal and replacement of the Robson Ranch WRP UV System and integration of the new system. Temporary bypassing of East Lift Station and Robson WRP during Construction. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
