logo

Robust Methods for Harmonics Compliance Study

Sector: Manufacturing (Industrial) • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Current

The Robust Methods for Harmonics Compliance Study aims to develop a robust methodology for the harmonic compliance assessment processes. The Robust Methods for Harmonics Compliance Study acknowledges that there are significant challenges associated with the assessment of compliance of harmonic emission with allocations provided by Network Service Providers (NSPs). The current regulatory guidelines

Project Information FAQ

Project Information

5 Q
The project “Robust Methods for Harmonics Compliance Study” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

current

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Robust Methods for Harmonics Compliance Study aims to develop a robust methodology for the harmonic compliance assessment processes. The Robust Methods for Harmonics Compliance Study acknowledges that there are significant challenges associated with the assessment of compliance of harmonic emission with allocations provided by Network Service Providers (NSPs). The current regulatory guidelines are not prescriptive and do not account for the recent complexities of the energy system caused by Variable Renewable Energy (VRE). As a result, NSPs are implementing individual compliance assessment methodologies that vary by region, potentially leading to inconsistent outcomes, unnecessary curtailment, and over investment in harmonic mitigation equipment. The Robust Methods for Harmonics Compliance Study aims to address these challenges by developing a robust and prescriptive methodology for the harmonic compliance assessment processes. This will be used as an interim best practice guideline for voluntary use by participating industry stakeholders, and as the basis for a submission to amend the Australian Standards and potentially the National Electricity Rules.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data