logo

Rocchetta Tunnel Excavation on Naples–Bari High-Speed Rail Line

Sector: Mass Transit • Location: Naples/Bari, Campania, Italy

Source: Megaproject

Project
Under Construction

The Rocchetta Tunnel, part of the Apice–Hirpinia section of the Naples–Bari high-speed rail line, was fully excavated by Webuild. The tunnel is approximately 6.5 km long, running through the southern Apennines, and is the longest tunnel on this section. The excavation used the 'Futura' TBM machine, operating continuously for about one and a half years. The project includes installation of over 32,

Project Information FAQ

Project Information

4 Q
The project “Rocchetta Tunnel Excavation on Naples–Bari High-Speed Rail Line” is an infrastructure initiative in the Mass Transit sector, located in Naples/Bari, Campania, Italy. Taiyo aggregates data on it from Megaproject.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Rocchetta Tunnel, part of the Apice–Hirpinia section of the Naples–Bari high-speed rail line, was fully excavated by Webuild. The tunnel is approximately 6.5 km long, running through the southern Apennines, and is the longest tunnel on this section. The excavation used the 'Futura' TBM machine, operating continuously for about one and a half years. The project includes installation of over 32,500 prefabricated concrete segments forming the tunnel's support structure. The Apice–Hirpinia section will be 18.7 km long, with nearly 13 km in tunnels, traversing the provinces of Avellino and Benevento. Related works include development of access to the future Hirpinia station with new roads, roundabouts, and parking areas. Excavation of the Melito Tunnel, the last tunnel in this section, will begin soon. The overall Naples–Bari line will have 145 km of new track, 15 tunnels, 25 viaducts, and 20 stations, enabling train speeds up to 250 km/h and reducing travel time between Naples and Bari to about two hours.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data