Rochester Asset Management Program Development
One of 8,613 projects Taiyo tracks in New Hampshire.
Source: Dodge USA
This program builds upon the work completed in previous years. Previously, infrastructure assets have been inventoried and mapped. Inventory is currently being enhanced beyond simply locational data to include: type of asset, age, condition, service history, projected useful life, and criticality. The requested funds will be to continue phase 2 of the program which will include development risk-ba
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Commercial, Water Supply and Storage, Government
- Location
- Rochester, New Hampshire, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Rochester Asset Management Program Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This program builds upon the work completed in previous years. Previously, infrastructure assets have been inventoried and mapped. Inventory is currently being enhanced beyond simply locational data to include: type of asset, age, condition, service history, projected useful life, and criticality. The requested funds will be to continue phase 2 of the program which will include development risk-based prioritization of assets (likelihood of failure and consequence of failure matrix) and develo... |
Budget |
Location
Country | United States of America (USA) |
State | New Hampshire |
City | Rochester |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Commercial, Water Supply and Storage, Government |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
