Rock Harbour Force Main Extension
Sector: Water Supply and Storage • Location: Austin, Texas, United States of America
Source: Dodge USA
The Rock Harbour Force Main project consists of approximately 4,500 linear feet of a new 18-inch HDPE force main installed from Rock Harbour LS to the existing 16-inch ductile iron force main on Vista Parke Drive. The alignment parallels Rock Harbour Drive, crosses FM 620, parallels Wilson Park Avenue, turns south on Woodbay Parke Drive, then connects to the existing Four Points #2 16-inch force m
- Status
- Closed
- Sector
- Water Supply and Storage, Raw Materials, Seaport, Waste Processing and Treatment, Commercial, Car parking, Metal, Government, Automotive, Steel
- Location
- Austin, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Rock Harbour Force Main Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Rock Harbour Force Main project consists of approximately 4,500 linear feet of a new 18-inch HDPE force main installed from Rock Harbour LS to the existing 16-inch ductile iron force main on Vista Parke Drive. The alignment parallels Rock Harbour Drive, crosses FM 620, parallels Wilson Park Avenue, turns south on Woodbay Parke Drive, then connects to the existing Four Points #2 16-inch force main. The proposed force main across RM 620 will be installed via trenchless construction while th... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Austin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Seaport, Waste Processing and Treatment, Commercial, Car parking, Metal, Government, Automotive, Steel |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
