Rock Island City - 2339 38th Street Sewer Replacement
Sector: Water Supply and Storage • Location: Rock Island, Illinois, United States of America
Source: Dodge
Replace all the existing clay from house out to the main with new PVC. The front porch has the sewer line and the water service running directly under. Use approved saddle to tie in PVC to the main. There is a clean out with in 5 of the exterior wall in the basement currently. If the old sewer connection at the main has to be abandoned then approved patch on the main will be required with concrete
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Government, Cement
- Location
- Rock Island, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Rock Island City - 2339 38th Street Sewer Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replace all the existing clay from house out to the main with new PVC. The front porch has the sewer line and the water service running directly under. Use approved saddle to tie in PVC to the main. There is a clean out with in 5 of the exterior wall in the basement currently. If the old sewer connection at the main has to be abandoned then approved patch on the main will be required with concrete around the patch. The PVC line must be fully supported in undisturbed soil or compacted rock alo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Rock Island |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Government, Cement |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
