Rock Island Street Driveway Pavement
Sector: Car parking • Location: Rock Island, Illinois, United States of America
Source: Dodge USA
Rem. & Replace Exist. Street Driveway Pavement, Incl. Earth Excavation 586 Cy, Geotech Fabric 3629 Sy, Sodding 1969 Sy, Aggregate Base Course 1039 Ton, Pcc Pavement 8" W/ Integral Curb 3370 Sy, Pcc Driveway Pavement 6" 645 Sy, Pcc Concrete Sidewalk 5" 50 Sf, Pavement Removal 3370 Sy, Driveway Pavement Removal 613 Sy, Pipe Underdrain 4" 2337 Ft, Etc.
- Status
- Closed
- Sector
- Car parking, Road, Cement, Manufacturing (Industrial), Commercial, Automotive, Government
- Location
- Rock Island, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Rock Island Street Driveway Pavement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rem. & Replace Exist. Street Driveway Pavement, Incl. Earth Excavation 586 Cy, Geotech Fabric 3629 Sy, Sodding 1969 Sy, Aggregate Base Course 1039 Ton, Pcc Pavement 8" W/ Integral Curb 3370 Sy, Pcc Driveway Pavement 6" 645 Sy, Pcc Concrete Sidewalk 5" 50 Sf, Pavement Removal 3370 Sy, Driveway Pavement Removal 613 Sy, Pipe Underdrain 4" 2337 Ft, Etc. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Rock Island |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Cement, Manufacturing (Industrial), Commercial, Automotive, Government |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
