Rock Tech Lithium Processing Facility
Sector: Energy Storage • Location: Red Rock, Ontario, Canada
Source: Mining.com
Rock Tech Lithium is developing a lithium converter facility in northern Ontario intended to produce battery-grade lithium hydroxide for North American customers. The project aims to reduce reliance on overseas refiners by using Rock Tech's converter design from its Guben, Germany operation. The facility will be located at the Red Rock site, a 337-acre property with existing industrial infrastruct
- Status
- Prospective
- Sector
- Energy Storage, Manufacturing (Industrial)
- Location
- Red Rock, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Mining.com
ConstructChat
Ask ConstructChat about Rock Tech Lithium Processing Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rock Tech Lithium is developing a lithium converter facility in northern Ontario intended to produce battery-grade lithium hydroxide for North American customers. The project aims to reduce reliance on overseas refiners by using Rock Tech's converter design from its Guben, Germany operation. The facility will be located at the Red Rock site, a 337-acre property with existing industrial infrastructure. |
Original sector | Battery Metals |
Budget |
Location
Country | Canada |
State | Ontario |
City | Red Rock |
Source
Source | Mining.com |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Manufacturing (Industrial) |
Article published date | 2026-04-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Canada
- Transition to Zero-Emission Buses
- Fundy Trail Development Authority Inc.Hearst Lodge solar power and battery storage energy conversion
- Conventional Vehicle Replacement
- North West Redwater Sturgeon Bitumen Refinery, Alberta
- Canyon Creek Pumped Hydro Energy Storage Project
- Electric Vehicle Battery Cell Plant (Volkswagen Group)
- Hybrid Buses Rehabilitation
- Aura Peace Butte Solar
