ROCKDALE RIVER TRAIL - PHASE II
Sector: Metal • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Location: Parallel to the South River from the State Route 138 bridge over the South River to the Monastery of the Holy Spirit
DESCRIPTION: A 1.2 mile long, twelve foot wide, 3000 psi concrete multi-use trail with a 200ft long+/- clear span metal bridge over the South River.
PROPOSED TYPICAL SECTION: Twelve foot wide, five inch thick, 3000 psi concrete trail with dashed centerline stripi
- Status
- Closed
- Sector
- Metal, Bridge, Cement, Road, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about ROCKDALE RIVER TRAIL - PHASE II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Location: Parallel to the South River from the State Route 138 bridge over the South River to the Monastery of the Holy Spirit DESCRIPTION: A 1.2 mile long, twelve foot wide, 3000 psi concrete multi-use trail with a 200ft long+/- clear span metal bridge over the South River. PROPOSED TYPICAL SECTION: Twelve foot wide, five inch thick, 3000 psi concrete trail with dashed centerline striping, graded and grassed/mulched three-plus ft shoulders, a ten ft. vertical clear zone, and at least two landscaped rest areas. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Metal, Bridge, Cement, Road, Government |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
