Rockfish B4.9 Solar Utility Station
Sector: Power Generation (CCGT) • Location: Fayetteville, North Carolina, United States of America
Source: Dodge USA
bids from qualified, interested contractors to procure, install, interconnect to PWC s distribution grid, test, and commission a utility scale turn-key 4.875MW (AC) solar photovoltaic generating station (the Project ) to be located at Tracy Hall Road, Parcel 0454-02-0075, Fayetteville, North Carolina (the Site ). PWC will thereafter own, operate, and maintain the Project and the Site, SOLAR ELECTR
- Status
- Closed
- Sector
- Power Generation (CCGT), Power Transmission, Commercial, Raw Materials, Solar, Government, Road
- Location
- Fayetteville, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Rockfish B4.9 Solar Utility Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | bids from qualified, interested contractors to procure, install, interconnect to PWC s distribution grid, test, and commission a utility scale turn-key 4.875MW (AC) solar photovoltaic generating station (the Project ) to be located at Tracy Hall Road, Parcel 0454-02-0075, Fayetteville, North Carolina (the Site ). PWC will thereafter own, operate, and maintain the Project and the Site, SOLAR ELECTRIC SYSTEM PROJECT - 5,948.8 KWDC/ 4,875.00 KWAC 34.96195, -78.83766 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Fayetteville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Commercial, Raw Materials, Solar, Government, Road |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
