logo

Rocky Creek Slip Out Emergency Project Permanent Structure

Sector: Cement • Location: California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Ongoing

On March 30, at post mile 60.0 on U.S. Route 1 between the Rocky Creek Bridge and Rocky Creek Viaduct, a slip out occurred, resulting in the undermining of the southbound lane. Emergency temporary stabilization was achieved by installing horizontal and vertical rock dowels with mesh-reinforced shotcrete applied to the vertical face. One-way traffic control was established using temporary railing a

Project Information FAQ

Project Information

5 Q
The project “Rocky Creek Slip Out Emergency Project Permanent Structure” is an infrastructure initiative in the Cement sector, located in California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On March 30, at post mile 60.0 on U.S. Route 1 between the Rocky Creek Bridge and Rocky Creek Viaduct, a slip out occurred, resulting in the undermining of the southbound lane. Emergency temporary stabilization was achieved by installing horizontal and vertical rock dowels with mesh-reinforced shotcrete applied to the vertical face. One-way traffic control was established using temporary railing and an automated traffic signal. The emergency project will continue with the construction of a permanent structure consisting of a viaduct to support the roadway with one lane of traffic in each direction. The emergency project will also include repairs to the concrete seawall at the base of the cliff to prevent additional cliff retreat and to provide stability to the roadway and proposed viaduct.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data