logo
ProjectDisapproved By City Council, Stop-Work Order Issued

Rocky Ridge Development Mining Project at 4004 Angola Rd.

Sector: Water Supply and Storage • Location: Toledo, Ohio, United States

Source: NewsBreak: Local News & Alerts

Rocky Ridge Development LLC is conducting a mining operation at 4004 Angola Rd. in South Toledo, extracting sand and clay and replacing it with drinking water treatment material (DWTM) from the Collins Park Water Treatment Plant. The sand and clay are used for elevation at Lucas County's new materials recovery facility through a subcontract with Geo. Gradel Co. The company proposes that the land,

Status
Failure
Sector
Water Supply and Storage, Commercial, Residential, Manufacturing (Industrial)
Location
Toledo, Ohio, United States of America
Updated
22 Jul 2026
Source
NewsBreak: Local News & Alerts

ConstructChat

Ask ConstructChat about Rocky Ridge Development Mining Project at 4004 Angola Rd.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rocky Ridge Development Mining Project at 4004 Angola Rd.” is an infrastructure initiative in the Water Supply and Storage sector, located in Toledo, Ohio, United States. Taiyo aggregates data on it from NewsBreak: Local News & Alerts.

Participants

Not available for this record.

Status

Original status

disapproved by city council, stop-work order issued

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Rocky Ridge Development LLC is conducting a mining operation at 4004 Angola Rd. in South Toledo, extracting sand and clay and replacing it with drinking water treatment material (DWTM) from the Collins Park Water Treatment Plant. The sand and clay are used for elevation at Lucas County's new materials recovery facility through a subcontract with Geo. Gradel Co. The company proposes that the land, once filled with DWTM, could be used for residential, commercial, and industrial construction when properly engineered. The project requires zone changes to general industrial, which were disapproved by the Toledo City Council, leading to a stop-work order.

Original sector

Mining

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Toledo

Source

Source

NewsBreak: Local News & Alerts

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Residential, Manufacturing (Industrial)

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project