logo
ProjectClosed

Rodeo Grounds PS Backup Power System Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The project consists of removing the existing manual transfer switch and replacing it with a new, automatic one, reworking the wiring and connections on the conductors between the new automatic transfer switch (AST) and exterior junction box to the left of the utility meter, and replacing the generator with a new generator on the same supports. Remove the existing generator. Install new generator

Status
Closed
Sector
Waste Processing and Treatment, Commercial, Power Generation (CCGT), Power Transmission, Government
Location
Cambria, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Rodeo Grounds PS Backup Power System Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rodeo Grounds PS Backup Power System Replacement” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Cambria, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of removing the existing manual transfer switch and replacing it with a new, automatic one, reworking the wiring and connections on the conductors between the new automatic transfer switch (AST) and exterior junction box to the left of the utility meter, and replacing the generator with a new generator on the same supports. Remove the existing generator. Install new generator on I-beam supports used for existing generator. Tie in existing wiring and test system. Flush-cut...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Cambria

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Commercial, Power Generation (CCGT), Power Transmission, Government

Article published date

2025-01-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project