logo
ProjectClosed

Rogue River Road Shared Use Pathway & Pedestrian Bridge

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

SCOPE OF PROJECT The project consists of furnishing all material and constructing the following: Approximately 10,100 lineal feet of 8-foot wide HMA Shared Use Pathway Approximately 25 lineal feet of10-foot Treated Timber Boardwalk One 175 foot long Prefabricated Steel Pedestrian Bridge with Abutments Approximately 390 lineal feet of Steel Sheet Pile Wall Approximately 12,000 square yards of Slope

Status
Closed
Sector
Forest Products and Packaging, Steel, Government, Road, Bridge, Commercial, Car parking, Automotive, Metal
Location
Belmont, Michigan, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Rogue River Road Shared Use Pathway & Pedestrian Bridge

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rogue River Road Shared Use Pathway & Pedestrian Bridge” is an infrastructure initiative in the Forest Products and Packaging sector, located in Belmont, Michigan, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

SCOPE OF PROJECT The project consists of furnishing all material and constructing the following: Approximately 10,100 lineal feet of 8-foot wide HMA Shared Use Pathway Approximately 25 lineal feet of10-foot Treated Timber Boardwalk One 175 foot long Prefabricated Steel Pedestrian Bridge with Abutments Approximately 390 lineal feet of Steel Sheet Pile Wall Approximately 12,000 square yards of Slope Restoration, Type A Including all necessary appurtenances and restoration.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Belmont

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Steel, Government, Road, Bridge, Commercial, Car parking, Automotive, Metal

Article published date

2025-08-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project