logo
ProjectNot Applicable

Rohne Coal Block

Not applicable · Jharkhand

Source: India Investment Grid (IIG)

Information National Mineral Development Corporation Limited [NMDC] has come up with Rohne Coal Block with a ticket size of 2485 INR Crores. This project in Coal sub-sector involves The current status of the project is Not Applicable Economic/Social Impact of the Project Rohne coal Block is a Coking Coal block with Total resource of 421MT, Reserves of 191MT and production capacity of 8MTPA Per An

Status
Under Construction
Sector
Water Supply and Storage, Steel, Government
Location
Hazaribagh, Jharkhand, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about Rohne Coal Block

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Rohne Coal Block” is an infrastructure initiative in the Water Supply and Storage sector, located in Hazaribagh, Jharkhand, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Status

Original status

not applicable

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information National Mineral Development Corporation Limited [NMDC] has come up with Rohne Coal Block with a ticket size of 2485 INR Crores. This project in Coal sub-sector involves The current status of the project is Not Applicable Economic/Social Impact of the Project Rohne coal Block is a Coking Coal block with Total resource of 421MT, Reserves of 191MT and production capacity of 8MTPA Per Annum. The coal mine has been allotted to NMDC on 17.06.2021 under section 5 of Coal Mines Special Provisions Act 2015 after intervention of highest Authority of Govt. of India. The coal mine was previously with Rohne coal company Private Limited. After allotment of Coal mine the coal mine NMDC has obtained transfer of EC on 28.10.2021. transfer of Stage I FC 16.11.2021 pertaining to Mining area. However in obtaining Stage II FC NMDC is facing issue in complying the Compensatory Afforestation related condition. After obtaining transfer of Sage I FC NMDC in December 2021 requested for modification in stage I FCs CA land related condition as to raise CA over degraded forest land twice the extent of the land required. However the same has been rejected by MoEF&CC on 30.04.2024. Therefore NMDC vide letter dated 27.05.2024 requested Govt. of Jharkhand to provide Govt. land that are suitable for CA. As per the time line committed in allotment agreement & allotment order the mine is required to operationalize by 18.09.2025.

Original sector

Coal

Procurement method

Budget

Location

Country

India

State

Jharkhand

City

Hazaribagh

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Steel, Government

Article published date

2025-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project