Rohne Coal Block
Sector: Water Supply and Storage • Location: Hazaribagh, Jharkhand, India
Source: India Investment Grid (IIG)
Information National Mineral Development Corporation Limited [NMDC] has come up with Rohne Coal Block with a ticket size of 2485 INR Crores. This project in Coal sub-sector involves The current status of the project is Not Applicable Economic/Social Impact of the Project Rohne coal Block is a Coking Coal block with Total resource of 421MT, Reserves of 191MT and production capacity of 8MTPA Per An
- Status
- Under Construction
- Sector
- Water Supply and Storage, Steel, Government
- Location
- Hazaribagh, Jharkhand, India
- Updated
- 22 Jul 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about Rohne Coal Block
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | not applicable |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Information National Mineral Development Corporation Limited [NMDC] has come up with Rohne Coal Block with a ticket size of 2485 INR Crores. This project in Coal sub-sector involves The current status of the project is Not Applicable Economic/Social Impact of the Project Rohne coal Block is a Coking Coal block with Total resource of 421MT, Reserves of 191MT and production capacity of 8MTPA Per Annum. The coal mine has been allotted to NMDC on 17.06.2021 under section 5 of Coal Mines Special Provisions Act 2015 after intervention of highest Authority of Govt. of India. The coal mine was previously with Rohne coal company Private Limited. After allotment of Coal mine the coal mine NMDC has obtained transfer of EC on 28.10.2021. transfer of Stage I FC 16.11.2021 pertaining to Mining area. However in obtaining Stage II FC NMDC is facing issue in complying the Compensatory Afforestation related condition. After obtaining transfer of Sage I FC NMDC in December 2021 requested for modification in stage I FCs CA land related condition as to raise CA over degraded forest land twice the extent of the land required. However the same has been rejected by MoEF&CC on 30.04.2024. Therefore NMDC vide letter dated 27.05.2024 requested Govt. of Jharkhand to provide Govt. land that are suitable for CA. As per the time line committed in allotment agreement & allotment order the mine is required to operationalize by 18.09.2025. |
Original sector | Coal |
Procurement method | |
Budget |
Location
Country | India |
State | Jharkhand |
City | Hazaribagh |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Mahan I Power Project Madhya Pradesh
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Nathpa Jhakri India Hydroelectric Power Plant
