logo

Rohtak Hissar Tollway Private Limited

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

In March 2013, the National Highway Authority of India (NHAI) awarded a 22-year concession (including construction period of 910 days which was about 2.5 years) to Sadbhav Engineering Limited for the strengthening, improvement, 4-laning, operation and maintenance, and tolling of 98.81kms (from KM87.000 to KM170.000 including connecting link from KM87.000 on NH10 to KM348.000 on NH71) of Rohtak to

Status
Prospective
Sector
Automotive, Bridge, Residential, Road, Government, Commercial, Waste Processing and Treatment
Location
Haryana, India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Rohtak Hissar Tollway Private Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Rohtak Hissar Tollway Private Limited” is an infrastructure initiative in the Automotive sector, located in Haryana, India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In March 2013, the National Highway Authority of India (NHAI) awarded a 22-year concession (including construction period of 910 days which was about 2.5 years) to Sadbhav Engineering Limited for the strengthening, improvement, 4-laning, operation and maintenance, and tolling of 98.81kms (from KM87.000 to KM170.000 including connecting link from KM87.000 on NH10 to KM348.000 on NH71) of Rohtak to Hissar section of National Highway-10 (NH10),in the state of Haryana. Under the contract, Sadbhav Engineering Limited was responsible for the design, construction, finance,operation and maintenance and widening of the existing 2-lane carriageway to a 4-lane highway with paved shoulders. The scope included construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections, interchanges, drains, etc. The expansion project, part of National Highway Development Project Phase-III would ease traffic congestion and give significant stimulus to trade and commerce in the entire region. Sadbhav Engineering Limited established Rohtak Hissar Tollway Private Limited (RHTPL), a special purpose vehicle, to implement the project. The SPV won the tender through international competitive bidding, conducted by NHAI, by requesting the lowest upfront subsidy of US$ 36mn (INR 2115mn @58.6 INR/USD). Out of the 34 pre-qualified bidders, 5 developers participated in the final bid. Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession. The concession agreement for the project was signed in October 2013. The project attained financial closure on 9th November 2013. The grant/debt/equity ratio for the project was 17/75/8. The estimated capital cost of the project at the time of financial closure was US$ 217mn (INR 12715.8mn @58.6 INR/USD). Apart from viability gap funding (grant) of INR 2115mn, financing comprised of a 18-year term loan of US$ 162.5mn (INR 9524mn) and sponsor equity of US$ 18.4mn (INR 1076.8mn). The term loan had a repayment schedule of 174 monthly installments. The debt was solely arranged by Canara Bank. Construction on the project was expected to begin in 26th December 2013 (this was the assigned appointment date post signing of concession agreement in October 2013 and financial closure in November 2013) and be completed by June 2016.

Original sector

Transport

Procurement method

Budget

Location

Country

India

State

Haryana

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Automotive, Bridge, Residential, Road, Government, Commercial, Waste Processing and Treatment

Article published date

2024-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project