Rolla High School and Middle School Field Upgrades
Sector: Manufacturing (Industrial) • Location: Rolla, Missouri, United States of America
Source: Dodge
Furnish all labor, materials, tools, and equipment required to the General Contractor and Artificial Turf Contractor (ATC) to install the artificial turf surfacing system with resilient infill, including prefabricated shock and game lines and event markings, as per the drawings and specifications herein and as per the recommendations for installation of the artificial turf product issued by the Ar
- Status
- Closed
- Sector
- Manufacturing (Industrial), Government, Education, Car parking, Automotive, Commercial
- Location
- Rolla, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Rolla High School and Middle School Field Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Furnish all labor, materials, tools, and equipment required to the General Contractor and Artificial Turf Contractor (ATC) to install the artificial turf surfacing system with resilient infill, including prefabricated shock and game lines and event markings, as per the drawings and specifications herein and as per the recommendations for installation of the artificial turf product issued by the Artificial Turf Manufacturer (ATM); including components and accessories required for a complete in... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Rolla |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Government, Education, Car parking, Automotive, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
