logo
ProjectClosed

Rolling Acres Water Main Replacement

Closed · Maryland · Last reported Mar 2025

Source: Dodge

Rolling Acres Water Main Replacement Description Replacement of approximately 496 feet of 4 inch water main, 5,391 feet of 8 inch water main, and relocation of approximately 244 feet of 4 inch water main, 1,771 feet of 8 inch water main, and installation of 19 fire hydrants and water house connections for 155 properties to serve Dale Drive, Phillips Drive, Carnot Drive, Basel Drive, Farrar Court,

Status
Closed
Sector
Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
Location
Upper Marlboro, Maryland, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Rolling Acres Water Main Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rolling Acres Water Main Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Upper Marlboro, Maryland, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Rolling Acres Water Main Replacement Description Replacement of approximately 496 feet of 4 inch water main, 5,391 feet of 8 inch water main, and relocation of approximately 244 feet of 4 inch water main, 1,771 feet of 8 inch water main, and installation of 19 fire hydrants and water house connections for 155 properties to serve Dale Drive, Phillips Drive, Carnot Drive, Basel Drive, Farrar Court, Farrar Terrace, Dakin Court, Angora Terrace and Angora Court in Upper Marlboro and Cheltenham of ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Maryland

City

Upper Marlboro

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Waste Processing and Treatment, Commercial

Article published date

2025-03-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project