Rollover Pier Construction Galveston
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Contractor to construct the concrete fishing pier in its entirety. Drive pile, CIP caps (or precast alternate), CIP diaphragms, CIP notch's, CIP bollards, CIP Decking, Install expansion joints covers, install timber decking and rail. Fish cleaning station, benches, trash receptacles to be completed by others. Installation of metal bait shop building to be completed by others. Installation of metal
- Status
- Closed
- Sector
- Steel, Forest Products and Packaging, Manufacturing (Industrial), Commercial, Rail, Residential, Cement, Metal
- Location
- Galveston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Rollover Pier Construction Galveston
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contractor to construct the concrete fishing pier in its entirety. Drive pile, CIP caps (or precast alternate), CIP diaphragms, CIP notch's, CIP bollards, CIP Decking, Install expansion joints covers, install timber decking and rail. Fish cleaning station, benches, trash receptacles to be completed by others. Installation of metal bait shop building to be completed by others. Installation of metal building anchorage to CIP deck slab to be included in decking price, anchorage requirement shall... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Galveston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Forest Products and Packaging, Manufacturing (Industrial), Commercial, Rail, Residential, Cement, Metal |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
