Ronald Reagan Logistics Center Ph 2 Master Report
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
may include five facilities totaling more than 2.4 million square feet of warehouse space, along with several retail opportunities Bldg 1/ 1,046,520 sq ft - bldg 2 /340,200 sq ft - bldg 3 /771,680 sq ft bldg 4/ 122,340 sq ft bldg bldg 5 122,340 sq ft
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Warehouse, Commercial, Residential
- Location
- Brownsburg, Indiana, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Ronald Reagan Logistics Center Ph 2 Master Report
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | may include five facilities totaling more than 2.4 million square feet of warehouse space, along with several retail opportunities Bldg 1/ 1,046,520 sq ft - bldg 2 /340,200 sq ft - bldg 3 /771,680 sq ft bldg 4/ 122,340 sq ft bldg bldg 5 122,340 sq ft |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Brownsburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Warehouse, Commercial, Residential |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
