ROOF 101 Warren AV
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
1.) Roof (House and Garage, backside of the main roof not included)
- Strip existing shingles
- Repair rotten wood on the roof decking where it is necessary. (100 Sq. Ft. no cost to the customer, over 100 sq. Ft. customer will be charged $4.00 / Sq. Ft.)
- Re-nail all loose roof decking
- Install ice & water shield (CertainTeed Winterguard) over the edges, valleys, around the skylight, and around
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Car parking, Steel, Metal, Commercial, Government, Automotive
- Location
- Hyde Park, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ROOF 101 Warren AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | 1.) Roof (House and Garage, backside of the main roof not included) - Strip existing shingles - Repair rotten wood on the roof decking where it is necessary. (100 Sq. Ft. no cost to the customer, over 100 sq. Ft. customer will be charged $4.00 / Sq. Ft.) - Re-nail all loose roof decking - Install ice & water shield (CertainTeed Winterguard) over the edges, valleys, around the skylight, and around the chimneys (6') - Install underlayment Felt-15 over entire roof decking. - Install Certain Teed Landmark Lifetime designer shingles with lifetime factory warranty in a color matched with the existing color, or any available colors decided by the customer. - Install aluminum back pan on the high side of the chimney to keep water away from the chimney. - Install new aluminum drip edge, pipe flashings, and step flashing. - Install new air vents - Remove roof debris from property and dispose of it. - The price includes 7yr. Warranty on labor, and permit fees. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Hyde Park |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Car parking, Steel, Metal, Commercial, Government, Automotive |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
