ROOF 110 Brainerd RD
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
existing flat roof has original/one layer TAR & GRAVEL (most gravel ballast in gone)... remainder of ballast on roof will be leveled out as existing roof is to remain in place. Additional poly iso insulation shall be mechanically attached atop existing roof with one layer ofEPDM/RUBBER roof to be fully adhered to it.
NOTE:Structure is in good condition at time of inspection/estimation... no rot,
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Allston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ROOF 110 Brainerd RD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | existing flat roof has original/one layer TAR & GRAVEL (most gravel ballast in gone)... remainder of ballast on roof will be leveled out as existing roof is to remain in place. Additional poly iso insulation shall be mechanically attached atop existing roof with one layer ofEPDM/RUBBER roof to be fully adhered to it. NOTE:Structure is in good condition at time of inspection/estimation... no rot, deflection or any other visible damage. Photographs were taken. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Allston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
