logo
ProjectOpenBP

ROOF 199 Beech ST

The status, timeline and source of this project. A free account opens every field.

Source: City of Boston

** Remove copper hip metal and save. ** Remove first (7) courses of slate from the perimeter of main slate roof and save. ** Remove snow gates in the front and right side of house on slate roof and save. ** Lay down ice and water shield 72 inches up from edge of roof and over top of fascia board. ** Install (approximately 132 feet) of new 16 oz. copper 8 inch drip edge metal. ** Allowance of 60

Status
Prospective
Sector
Road, Water Supply and Storage, Metal, Commercial, Government, Manufacturing (Industrial)
Location
Roslindale, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about ROOF 199 Beech ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ROOF 199 Beech ST” is an infrastructure initiative in the Road sector, located in Roslindale, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

** Remove copper hip metal and save. ** Remove first (7) courses of slate from the perimeter of main slate roof and save. ** Remove snow gates in the front and right side of house on slate roof and save. ** Lay down ice and water shield 72 inches up from edge of roof and over top of fascia board. ** Install (approximately 132 feet) of new 16 oz. copper 8 inch drip edge metal. ** Allowance of 60 new slates only for damaged and or broken slates. ** Install existing saved slates. ** Install existing saved snow gates. ** Install existing saved copper hip metal. ** Remove first (3) courses of cedar shingle at sidewalls of lower shingle roofs. ** Remove asphalt shingles at sidewalls of all (3) lower shingle roofs and save. ** Remove sidewall step flashings. ** Lay down ice and water shield on exposed roof deck and up sidewalls. ** Install existing saved shingles with new step flashings. ** Install a new lead counter flashing detail at the top of lower shingle roofs. ** Install new Broan roof vent on lower right roof. ** Remove all job related debris from site.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Roslindale

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Metal, Commercial, Government, Manufacturing (Industrial)

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project