ROOF 39 Lorraine ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Strip and reroof. All rubber to be adhered with heavy duty roofing adhesive. Run rubber up any walls approximately 18". Russ strip to be installed at all walls and transitions. Install new cleat board around entire perimeter. Install custom 032 Aluminum drip edge along entire perimeter.
- Status
- Prospective
- Sector
- Steel, Metal, Commercial, Government
- Location
- Roslindale, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ROOF 39 Lorraine ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Strip and reroof. All rubber to be adhered with heavy duty roofing adhesive. Run rubber up any walls approximately 18". Russ strip to be installed at all walls and transitions. Install new cleat board around entire perimeter. Install custom 032 Aluminum drip edge along entire perimeter. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Roslindale |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Steel, Metal, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
