ROOF 648 E Sixth ST
Open · Massachusetts
Source: City of Boston
Remove existing shingles and dispose roofing products, replace rot, install aluminum drip edges, flash all pipes penetrations, rework flashing on drip edges and roof to wall, install ice/water shield along eves and 3 ft across valleys, around skylights and chimneys (see Estimate for more info)
- Status
- Prospective
- Sector
- Water Supply and Storage, Steel, Metal, Commercial, Government
- Location
- South Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ROOF 648 E Sixth ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove existing shingles and dispose roofing products, replace rot, install aluminum drip edges, flash all pipes penetrations, rework flashing on drip edges and roof to wall, install ice/water shield along eves and 3 ft across valleys, around skylights and chimneys (see Estimate for more info) |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | South Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Metal, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
