Rooftop Solar Power Upgrade - 3 Municipal Buildings and LED Lighting Upgrades
Sector: Solar • Location: Saskatchewan, Canada
Source: Infrastructure Canada
The proposed project will upgrade the power supply to three existing City of Moose Jaw municipal buildings (Yara Centre, City Hall, Mosaic Place) by attaching a total of 661 solar panels and associated equipment to each rooftop to serve a portion of the building electricity needs with clean and high-quality power. The project will also replace the existing high-intensity discharge (HID) fixtures a
- Status
- Closed
- Sector
- Solar, Government, Power Transmission, Power Generation (CCGT), Commercial
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Rooftop Solar Power Upgrade - 3 Municipal Buildings and LED Lighting Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will upgrade the power supply to three existing City of Moose Jaw municipal buildings (Yara Centre, City Hall, Mosaic Place) by attaching a total of 661 solar panels and associated equipment to each rooftop to serve a portion of the building electricity needs with clean and high-quality power. The project will also replace the existing high-intensity discharge (HID) fixtures at the Yara Centre with long life light-emitting diode (LED) bulbs and fixtures. The significant quantifiable components of the proposed project include: - Represent good value for the money: municipal operating cost savings (economic resiliency), much of the money is spent on local labour, a showcase clean energy project for the community; - Contribute to community objectives: direct economic benefits of lower building utility bills and indirect economic benefits of local jobs during installation and follow-on projects in the community; - Enhance and protect public health and/or environmental health: reduced greenhouse gases and potentially cleaner local air, much of the activity is outdoors with very low risk associated with COVID-19 transmission; - Funding need: currently no local incentives for solar power or LED light conversions so the project would most likely not happen without this Investing in Canada Infrastructure Program funding; - Technical feasibility: rooftop solar installations and LED lighting conversions as building upgrades are straightforward and can easily meet program timelines, solar powering a building exceeds building energy efficiency codes; - Project sustainability: the assets typically have a 25-year lifespan and LED lights will have approximately a 10-year lifespan with little maintenance requirements; - Community’s ability to financially support project: the project will reduce electrical bills and has a defined payback period; solar power is typically a low risk and stable output asset. Approximate project outputs that will be generated: - 15 local short-term jobs during project construction in 2021/2022 - 20,125 tonnes of greenhouse gas reductions over a 25 year conservatively estimated project lifespan (805 tonnes annually) - Approximately $165,000 of annual utility bill savings. |
Original sector | Green Energy |
Budget |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Solar, Government, Power Transmission, Power Generation (CCGT), Commercial |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in Canada
- Menno Simons School Addition and Modernization
- Northern Sunrise County Water Treatment Plant
- Claresholm Solar Project Alberta
- Travers Solar Project Alberta Canada
- Hydro-Québec Centrales solaires Gabrielle-Bodis et Robert-A.-Boyd
- Fundy Trail Development Authority Inc.Fundy trail solar energy conversion
- Mactaquac Provincial Park upgrades
- Fundy Trail Development Authority Inc.Hearst Lodge solar power and battery storage energy conversion
