ROR at Sasaram connecting GC to Ara-Sasaram line 8.95Km of East Central Railways
Sector: Bridge • Location: Sasaram, Bihar, India
Source: India Investment Grid (IIG)
Information East Central Railway [ECR] - II has come up with ROR at Sasaram connecting GC to Ara-Sasaram line 8.95Km of East Central Railways with a ticket size of 470.11 INR Crores. This project in Railway Track sub-sector involves construction of a new ROR at Sasaram to avoid surface crossing of busy GC Line and DFCCIL line. The current status of the project is under land-acquisition phase. Econ
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | not applicable |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information East Central Railway [ECR] - II has come up with ROR at Sasaram connecting GC to Ara-Sasaram line 8.95Km of East Central Railways with a ticket size of 470.11 INR Crores. This project in Railway Track sub-sector involves construction of a new ROR at Sasaram to avoid surface crossing of busy GC Line and DFCCIL line. The current status of the project is under land-acquisition phase. Economic/Social Impact of the Project The proposed RFO between Sasaram Link Cabin station and Karwandia Station starts from the UP Loop of Karwandia Station and connect into the proposed Sasaram Link Cabin/Station after flying over existing railway track and DFCCIL track. This RFO is mainly for crossing passenger trains as well loaded/empty rakes from Karwandia towards Ara-Bikramganj. Need of the proposed flyover was felt due to construction of DFCCIL railway line between Sasaram and Karwandia Station. It has been proposed to avoid surface crossing of busy Grand Chord Line. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
