Rose CCS Project
Sector: Commercial • Location: Texas, United States
Source: Hart Energy
Exxon Mobil is developing the Rose CCS project in Jefferson County, Texas, which includes three CO2 storage wells and CO2 monitoring systems. The project will store CO2 between 0.5 and 1.5 miles below the surface. An 18-mile pipeline will connect the captured CO2 from the Donaldsonville facility to the Rose CCS storage area. The U.S. EPA issued a draft Class VI permit for the project in July 2025,
- Status
- Prospective
- Sector
- Commercial, Residential
- Location
- Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Hart Energy
ConstructChat
Ask ConstructChat about Rose CCS Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | permitting |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Exxon Mobil is developing the Rose CCS project in Jefferson County, Texas, which includes three CO2 storage wells and CO2 monitoring systems. The project will store CO2 between 0.5 and 1.5 miles below the surface. An 18-mile pipeline will connect the captured CO2 from the Donaldsonville facility to the Rose CCS storage area. The U.S. EPA issued a draft Class VI permit for the project in July 2025, with final permits expected later in the year. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Hart Energy |
URL |
More Details
Record type | Project |
Sector | Commercial, Residential |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
