logo

Rose Whittle Delta Bloc Barrier System, United Kingdom

Sector: Bridge • Location: United Kingdom

Source: Road Traffic Technology

Project
Closed

Marshalls also offers s-ramp street furniture. delta bloc 80 M6 Rose Whittle Map The Delta Bloc barrier system is part of a £3.2m overhaul of the Rose Whittle Bridge, near junction 28 of the M6 at Leyland. The barrier project was completed on 28 January 2008. One of the major objectives of the project is to prevent long delays due to incidents involving bridge strikes as engineers need to check fo

Project Information FAQ

Project Information

4 Q
The project “Rose Whittle Delta Bloc Barrier System, United Kingdom” is an infrastructure initiative in the Bridge sector, located in United Kingdom. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Marshalls also offers s-ramp street furniture. delta bloc 80 M6 Rose Whittle Map The Delta Bloc barrier system is part of a £3.2m overhaul of the Rose Whittle Bridge, near junction 28 of the M6 at Leyland. The barrier project was completed on 28 January 2008. One of the major objectives of the project is to prevent long delays due to incidents involving bridge strikes as engineers need to check for damage before re-opening roads or railway lines. Construction Street infrastructure provider Marshalls Street Furniture replaced the original concrete barriers around the bridge with the pre-cast concrete barriers—DB 100AS-R—with a New Jersey profile to a single side, which are specifically designed for the protection of bridges. The barrier is uses repellent plate to prevent breakage in case of heavy impacts, along with baffle plate to transform the impact energy and a base to accommodate cross-drainage. The DB-100AS-R system block features the highest containment level H4b, a small working width, a proven edge beam load reduction of approximately 2/3 in case of impact, dilatation sets for expansion-joints up to 90 cm and low maintenance costs. The concrete used is frost and dew salt resistant. An essential part of the system is its continuous tension bar. A steel band runs through the pre-cast elements, providing a defined tensile force that absorbs impact energy and prevents breaking without cracking. A patented coupling links the individual elements and builds a sort of tensioned chain. The blocks are connected to the ground with stiffening plates. The barrier is secured to the concrete foundation with non-structural bolts that are designed to shear off. It imposes lower forces on the bridge deck than conventional concrete and steel barriers. It also significantly reduces the cost of carrying out deck strengthening works for the provision of a conventional barrier. Accessories fixed to the system include approved reflectors, sign posts, fences, and noise barrier and glare shield equipment. System certification The DB 100AS-R systems are tested at independent test houses according to the European Standard EN 1317 for road restraint systems. The containment level is set at H4b, the highest level. The combination of various heights and containment levels could be achieved because of the modular design of the new system. Benefits of the new system Delta Bloc’s barrier system is aimed at significantly reducing the impact of crashes on the superstructure of the bridge, thereby reducing the threat of delays to drivers and rail users. In comparison to steel systems, the Delta Bloc’s barrier system needs less maintenance and offers simple and quick exchange after damage, after which the tension bar is immediately effective again.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data