logo

Ross Road- Structure Replacement

Sector: Steel • Location: Charlottetown, Prince Edward Island, Canada

Source: Dodge USA

Project
Bidding

The scope of this work includes; but, is not necessarily limited to the following: the supply of all labour, equipment, and materials necessary to completely replace the existing timber bridge structure with a new timber bridge structure. The work on this project shall consist of but not limited to: excavation; slope protection; environmental controls; stream containment; demolition and removal of

Status
Prospective
Sector
Steel, Cement, Road, Forest Products and Packaging, Commercial, Bridge, Metal
Location
Charlottetown, Prince Edward Island, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Ross Road- Structure Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ross Road- Structure Replacement” is an infrastructure initiative in the Steel sector, located in Charlottetown, Prince Edward Island, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scope of this work includes; but, is not necessarily limited to the following: the supply of all labour, equipment, and materials necessary to completely replace the existing timber bridge structure with a new timber bridge structure. The work on this project shall consist of but not limited to: excavation; slope protection; environmental controls; stream containment; demolition and removal of existing structure; supply and installation of steel piles; concrete formwork and accessories; s...

Procurement method

Budget

Location

Country

Canada

State

Prince Edward Island

City

Charlottetown

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Steel, Cement, Road, Forest Products and Packaging, Commercial, Bridge, Metal

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project