Rossi Road Bridge and Paving Improvements Phase 1
Sector: Power Transmission • Location: California, United States of America
Source: Dodge
The work for the project generally consists of two grade beams across the road, six concrete CIDH piles, temporary roadway reconstruction including roadway excavation/grading, erosion and sediment control, traffic control, utility coordination, and auxiliary work shown on the plans.
- Status
- Closed
- Sector
- Power Transmission, Road, Bridge, Commercial, Car parking, Automotive, Cement, Power Generation (CCGT), Government
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Rossi Road Bridge and Paving Improvements Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work for the project generally consists of two grade beams across the road, six concrete CIDH piles, temporary roadway reconstruction including roadway excavation/grading, erosion and sediment control, traffic control, utility coordination, and auxiliary work shown on the plans. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Road, Bridge, Commercial, Car parking, Automotive, Cement, Power Generation (CCGT), Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
