Rotor Wind Farm
Sector: Power Generation (CCGT) • Location: Türkiye
Source: European Bank for Reconstruction and Development (EBRD)
The EBRD is considering financing the construction and development of a 135 MW onshore wind independent power project located in Osmaniye in Southern Turkey. The wind farm is being developed by Rotor Elektrik Uretim A.S., a company incorporated in Turkey and 100% owned by Zorlu Elektrik Uretim A.S (Zorlu Enerji). It is expected to be operational by the end of 2009 and will be Turkey’s largest wind
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The EBRD is considering financing the construction and development of a 135 MW onshore wind independent power project located in Osmaniye in Southern Turkey. The wind farm is being developed by Rotor Elektrik Uretim A.S., a company incorporated in Turkey and 100% owned by Zorlu Elektrik Uretim A.S (Zorlu Enerji). It is expected to be operational by the end of 2009 and will be Turkey’s largest wind farm to date. The Bank’s involvement in the project will promote further development of the power sector in Turkey as well as the following transition impact potential: Demonstration effects of new products and processes – The project would be the first large scale wind project in Turkey developed on a project finance basis. In addition, the project has the potential to lead to important demonstration effects in terms of environmental best practice as well as the financial viability of large scale wind projects which could attract new developers and investors in the sector. Improved regulatory framework – The regulatory and legislative framework for renewable energy in Turkey is still relatively new and untested. Through the Project, the Bank will support the regulatory framework, which has the potential to pave the way for additional renewable projects going forward. Deepening of markets – The project is expected to sell power to the open market, deepening the extent of the nascent Turkish power market. Rotor Elektrik Uretim A.S., a company incorporated in Turkey and 100% owned by Zorlu Elektrik Uretim A.S. Zorlu Enerji is majority controlled by Zorlu Holding A.S., a large Turkish conglomerate with operations in energy, textiles, electronics and white goods. The EBRD will provide up to €45 mln to Rotor Elektrik Uretim A.S. for the development of the wind farm. Also expected to participate in the financing package is IFC, EIB and commercial banks. €211 million. Screening category and applicable performance requirements Following an Initial Environmental Examination (IEE), the project has been screened B under the Bank’s Environmental and Social Policy 2008, requiring an Environmental and Social Due Diligence (ESDD). The project is at an advanced stage of construction and, therefore the Bank's ability to leverage change to sitting, design and access road construction is limited. Nevertheless, the IEE and subsequent ESDD confirmed that the site is not located in a sensitive location and that both the construction and future operational impacts can be readily identified, assessed and mitigated. The Bank has undertaken the ESDD jointly with the IFC who are also considering financing the project. The ESDD includes an Environmental Impact Assessment (EIA) prepared by an independent local consultancy and an environmental and social appraisal of the project by the Bank. A Non Technical Summary of the project EIA and related documents are available on the Company’s web site. Key Environmental and Social Issues and due diligence results Although wind farms have significant benefits in terms of generating carbon free electricity, they can be associated with environmental and social impacts due to the location, notably in terms of impact on flora and fauna as well as possible impact on land use. Although the project is not located in an environmentally or socially sensitive location, it will have a considerable impact on the landscape, due to its extensive infrastructure (access roads) and the positioning of 54 large wind turbines on a mountain ridge. This issue was identified as part of the ESDD, and although the impact is limited and the developer has designed steps to reduce impacts as far as possible, it can not be eliminated. The project did not require a full EIA under National legislation, however, an EIA has been developed by the Sponsor for the Lenders. This EIA has confirmed that the project will have limited impact on flora and fauna and that the site is located a considerable distance from bird migratory routes. Furthermore, the location will also have limited impact on land use and local livelihoods. The Sponsor is developing a social programme and will support local educational programmes. One of the main environmental impacts is associated with the development of the associated infrastructure such as the access roads to the site. To mitigate the potential impact of soil erosion, an environmental and social management and monitoring plan has been developed with the Sponsor and is included as part of the EIA. The ESDD has confirmed that the project is structured to meet the Bank’s Performance Requirements (PRs). Summary of Environmental and Social Action Plan As a result of the ESDD, an Environmental and Social Management and Monitoring Plan (ESMMP) has been prepared in line with the Bank’s Performance Requirements (PRs) to address both the construction and operational phase of the project. This includes the development of a systematic approach to environmental and social management of the construction process to limit erosion as well as avifauna monitoring at the wind farm. The Company will implement an environmental, health and safety management system to manage the construction, operation and future decommissioning phase. A Stakeholder Engagement Programme (SEP) has been developed by the Company, which will include the publication of annual information on environmental and social matters on the Company’s web sites, as well as local information in local newspapers, as appropriate. A grievance mechanism will be maintained by the Company. Implementation requirements None. Sinan Ak Zorlu Elektrik Uretim A.S. Zorlu Plaza 34310 Avcular Istanbul Turkey |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Generation (CCGT) projects in Türkiye
- Nef Gölköy Residences / EAA - Emre Arolat Architecture
- Monolithically Integrated ReRAM and In-Chip Cooling for Emerging Neuromorphic Applications
- An ML Approach to IFIs: Determinants of IMF Lending
- Crowd-Sourcing technology to change how people and cars move in cities
- An innovative solid lubricant based nano-dimensional coatings for industrial production
- Countering Insurgency/Terrorism: Severing the Ties between Non-State Armed Actors & Their Constituency
- Ultralow power and ultra-wideband spintronics near thermodynamic limits
- Development of nano-Photocatalytic Materials for Indoor Air Purification and Odour Elimination
