logo

Rough River Dam Safety Modify Phase 2 REBID

Sector: Water Supply and Storage • Location: Falls Of Rough, Kentucky, United States of America

Source: Dodge

Project
Closed

Rough River Dam Safety Modification Phase 2: New Outlet Works and Cutoff Wall. Cutoff Walls: Experience with at least two other cut-off wall projects similar in size with a minimum concrete seepage barrier that is 500-feet in length and installed at a minimum depth of 100 feet from the dam crest. Tunnels: Experience with at least two tunnels at least 200-feet in length which were mechanically exca

Status
Closed
Sector
Water Supply and Storage, Hydro, Tunnel, Cement, Manufacturing (Industrial), Commercial
Location
Falls Of Rough, Kentucky, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Rough River Dam Safety Modify Phase 2 REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Rough River Dam Safety Modify Phase 2 REBID” is an infrastructure initiative in the Water Supply and Storage sector, located in Falls Of Rough, Kentucky, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Rough River Dam Safety Modification Phase 2: New Outlet Works and Cutoff Wall. Cutoff Walls: Experience with at least two other cut-off wall projects similar in size with a minimum concrete seepage barrier that is 500-feet in length and installed at a minimum depth of 100 feet from the dam crest. Tunnels: Experience with at least two tunnels at least 200-feet in length which were mechanically excavated excluding tunnel boring machines and blasting. Dam Foundation Grouting (Slurry Control): Ex...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Kentucky

City

Falls Of Rough

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Tunnel, Cement, Manufacturing (Industrial), Commercial

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project