Rough River Dam Safety Modify Phase 2 REBID
Sector: Water Supply and Storage • Location: Falls Of Rough, Kentucky, United States of America
Source: Dodge
Rough River Dam Safety Modification Phase 2: New Outlet Works and Cutoff Wall. Cutoff Walls: Experience with at least two other cut-off wall projects similar in size with a minimum concrete seepage barrier that is 500-feet in length and installed at a minimum depth of 100 feet from the dam crest. Tunnels: Experience with at least two tunnels at least 200-feet in length which were mechanically exca
- Status
- Closed
- Sector
- Water Supply and Storage, Hydro, Tunnel, Cement, Manufacturing (Industrial), Commercial
- Location
- Falls Of Rough, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Rough River Dam Safety Modify Phase 2 REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rough River Dam Safety Modification Phase 2: New Outlet Works and Cutoff Wall. Cutoff Walls: Experience with at least two other cut-off wall projects similar in size with a minimum concrete seepage barrier that is 500-feet in length and installed at a minimum depth of 100 feet from the dam crest. Tunnels: Experience with at least two tunnels at least 200-feet in length which were mechanically excavated excluding tunnel boring machines and blasting. Dam Foundation Grouting (Slurry Control): Ex... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Falls Of Rough |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Tunnel, Cement, Manufacturing (Industrial), Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
