Rough terrain scissor lift
One of 10,000+ projects Taiyo tracks in Quebec.
Source: Infrastructure Canada
The rough terrain scissor lift has reached the end of its service life and requires frequent repairs. The annual inspection showed that some of its structural elements make it potentially dangerous. It must therefore be replaced.
- Status
- Closed
- Sector
- Government
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Rough terrain scissor lift
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The rough terrain scissor lift has reached the end of its service life and requires frequent repairs. The annual inspection showed that some of its structural elements make it potentially dangerous. It must therefore be replaced. |
Original sector | Public Transit |
Location
Country | Canada |
State | Quebec |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Canada
- Headingley Water Treatment Plant
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- St. Stephen Border Crossing
- Surgeon Lieutenant-Commander W. Anthony Paddon Building
- McMath Secondary School
- Niagara Falls Entertainment Centre
- Anzac Water Reservoir and Pump Station
- Toronto Airport Piers D and E Fixed Bridges
