Roughrider Project Pre-Feasibility Study
Planned · Saskatchewan · Last reported Jun 2025
Source: Stock Titan
Initiation of pre-feasibility study with metallurgical test work advanced including bulk solvent extraction, yellowcake precipitation, and tailings treatment. Preparation for formal S-K 1300 Pre-Feasibility Study underway.
- Status
- Prospective
- Sector
- Nuclear
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Stock Titan
ConstructChat
Ask ConstructChat about Roughrider Project Pre-Feasibility Study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Initiation of pre-feasibility study with metallurgical test work advanced including bulk solvent extraction, yellowcake precipitation, and tailings treatment. Preparation for formal S-K 1300 Pre-Feasibility Study underway. |
Original sector | Mining |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Stock Titan |
URL |
More Details
Record type | Project |
Sector | Nuclear |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Nuclear projects in Canada
- Bluenose Academy
- Waste Pollution Control Facility Upgrades - Phase 1 - LRAR
- The Bruce Power Generating Station Project
- Ottawa Cancer Centre (Queensway Carleton & The Ottawa Hospital)
- Cambridge Memorial Hospital
- Credit Valley Hospital Phase II Redevelopment Project
- Bruce Nuclear Power Plant
- Bruce Nuclear Power Plant (Phase 2)
