logo
ProjectBidding

Round Lake County Park Site Work

One of 10,000+ projects Taiyo tracks in Michigan.

Source: Dodge

Section 1: Removal of an old concrete slab and steps, with restoration work back to turf as follows: Removal and off-site disposal of a 27 x 21 concrete slab and 9 x 6 concrete steps. Installation of approximately 12 Cu Yards of screened top soil, graded and soil prepped for seed for turf restoration. Grass seed installation should use MDOT specs, at a minimum Straw blanket installation will be ne

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government, Wind, Cement, Car parking, Automotive
Location
Horton, Michigan, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Round Lake County Park Site Work

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Round Lake County Park Site Work” is an infrastructure initiative in the Water Supply and Storage sector, located in Horton, Michigan, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Section 1: Removal of an old concrete slab and steps, with restoration work back to turf as follows: Removal and off-site disposal of a 27 x 21 concrete slab and 9 x 6 concrete steps. Installation of approximately 12 Cu Yards of screened top soil, graded and soil prepped for seed for turf restoration. Grass seed installation should use MDOT specs, at a minimum Straw blanket installation will be necessary for approximately 650 sq. ft. o Note- Restoration area is located in a traditionally wind...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Horton

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government, Wind, Cement, Car parking, Automotive

Article published date

2025-01-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project