Round Lake Drain Master Plan Project Phase 2
One of 10,000+ projects Taiyo tracks in Illinois.
Source: Dodge
The project will focus on the development of a Master Planning document that will help guide SMC and the project partners in prioritizing projects and areas of opportunity to minimize risk and increase safety along the Round Lake Drain through hydrologic and hydraulic modeling and a wetland-based assessment of the corridor. The County of Lake May be Seeking a Consultant to Provide a Master Plan Se
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government, Water Supply and Storage, Waste Processing and Treatment
- Location
- Round Lake Beach, Illinois, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Round Lake Drain Master Plan Project Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project will focus on the development of a Master Planning document that will help guide SMC and the project partners in prioritizing projects and areas of opportunity to minimize risk and increase safety along the Round Lake Drain through hydrologic and hydraulic modeling and a wetland-based assessment of the corridor. The County of Lake May be Seeking a Consultant to Provide a Master Plan Service for The project will focus on the development of a Master Planning document that will help ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Round Lake Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government, Water Supply and Storage, Waste Processing and Treatment |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
