Round Pond Improvements
Sector: Waste Processing and Treatment • Location: Barrington, New Hampshire, United States of America
Source: Dodge
Increasing the full pond elevation of Round Pond Reservoir by eight feet to 398 feet increases the Firm Yield of the entire reservoir system to 3.89 million gallons per day (MGD). The FY25 request includes actual construction of a dike, dam, and spillway; and, the FY26 request is for improvements to the raw water transmission pipeline, and potentially a pump station.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | pre-design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Increasing the full pond elevation of Round Pond Reservoir by eight feet to 398 feet increases the Firm Yield of the entire reservoir system to 3.89 million gallons per day (MGD). The FY25 request includes actual construction of a dike, dam, and spillway; and, the FY26 request is for improvements to the raw water transmission pipeline, and potentially a pump station. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
