Round Pond Improvements
One of 8,613 projects Taiyo tracks in New Hampshire.
Source: Dodge USA
Increasing the full pond elevation of Round Pond Reservoir by eight feet to 398 feet increases the Firm Yield of the entire reservoir system to 3.89 million gallons per day (MGD). The FY25 request includes actual construction of a dike, dam, and spillway; and, the FY26 request is for improvements to the raw water transmission pipeline, and potentially a pump station.
- Status
- Prospective
- Sector
- Hydro, Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
- Location
- Barrington, New Hampshire, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Round Pond Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Increasing the full pond elevation of Round Pond Reservoir by eight feet to 398 feet increases the Firm Yield of the entire reservoir system to 3.89 million gallons per day (MGD). The FY25 request includes actual construction of a dike, dam, and spillway; and, the FY26 request is for improvements to the raw water transmission pipeline, and potentially a pump station. |
Budget |
Location
Country | United States of America (USA) |
State | New Hampshire |
City | Barrington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Government, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in United States of America
- SR 55 @ CLARKS MILLPOND DAM
- I-90 Keechelus Dam to Stampede Pass Phase 2A
- I-90 Snowshed to Keechelus Dam Phase 1C
- BUSH FIELD - LOCK AND DAM ROAD
- SR 9 FM S OF BUFORD DAM RD TO PIRKLE FERRY RD
- Contract to revamp Anderson's Dam together with the Valley Water District, near two fault lines in Santa Clara County, California (United States)
- Intake works, construction of wells and conduction of the hydraulic circuit in the Chira and Soria dams, in Gran Canaria (Spain)
- CR 742/BASS ROAD FROM PROVIDENCE BLVD TO NEW FORSYTH ROAD
