Roundabout CSAH 4/CSAH 133
Sector: Water Supply and Storage • Location: St. Cloud, Minnesota, United States of America
Source: Dodge USA
TYPE OF WORK: Roundabout Approximate major items of work are: Excavation 17,081 CY; Embankment 21,768 CY; Aggregate Base Class 6 11,750 TON; Concrete Pavement 8 416 SY; Bituminous Surfacing 4,901 TON; CS Pipe Culverts 300 LF; RC Pipe Culverts 68 LF; RC Pipe Sewer 1,547 LF; Drainage Structures 87 LF; Concrete Curb and Gutter 4,363 LF; Seeding 5.43 ACRE; Pavement Markings 10,758 LF;
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Government, Automotive, Commercial
- Location
- St. Cloud, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Roundabout CSAH 4/CSAH 133
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | TYPE OF WORK: Roundabout Approximate major items of work are: Excavation 17,081 CY; Embankment 21,768 CY; Aggregate Base Class 6 11,750 TON; Concrete Pavement 8 416 SY; Bituminous Surfacing 4,901 TON; CS Pipe Culverts 300 LF; RC Pipe Culverts 68 LF; RC Pipe Sewer 1,547 LF; Drainage Structures 87 LF; Concrete Curb and Gutter 4,363 LF; Seeding 5.43 ACRE; Pavement Markings 10,758 LF; |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | St. Cloud |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Government, Automotive, Commercial |
Article published date | 2023-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
