logo

ROUNDTREE BRIDGE RD @ LITTLE RVR TRIB 2.6 MI NE OF ELLENTON

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

This project is located approximately 2.6 miles northeast of Ellenton in Colquitt County, Georgia. The proposed bridge will be 240-ft long by 35.1-ft wide and will consist of one 11-ft travel lane in each direction, and 5-ft shoulders. The roadway typical section will consist of one 11-ft travel lane in each direction with 4-ft shoulders and have a maintained posted speed limit of 55 mph. The ex

Project Information FAQ

Project Information

3 Q
The project “ROUNDTREE BRIDGE RD @ LITTLE RVR TRIB 2.6 MI NE OF ELLENTON” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project is located approximately 2.6 miles northeast of Ellenton in Colquitt County, Georgia. The proposed bridge will be 240-ft long by 35.1-ft wide and will consist of one 11-ft travel lane in each direction, and 5-ft shoulders. The roadway typical section will consist of one 11-ft travel lane in each direction with 4-ft shoulders and have a maintained posted speed limit of 55 mph. The existing bridge is proposed to be replaced along the existing alignment so all traffic will be diverted to an off-site detour during construction of the new bridge. Use of detour requires additional 3.8 miles from existing traffic route. The existing right-of-way width is 100-ft, and right of way is anticipated to be purchased on 5 parcels. The project begins approximately 0.11 miles west of the existing bridge and ends approximately 0.11 miles east of the existing bridge along Roundtree Bridge Road for a total project length of approximately 0.26 miles.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data