logo
ProjectBidding

Route 13 Cavendish 2020

One of 4,618 projects Taiyo tracks in Prince Edward Island.

Source: Dodge USA

Removing approximately 525 metres of existing boardwalk, and constructing approximately 730 metres of active transportation (AT) trail, installing 360 metres of storm sewer along east side of road, and widening approximately 730 metres of existing roadway. The construction shall also include; earth excavation, placing select borrow, placing granular A, placing asphalt seal: B (85 mm) for 2.4 metre

Status
Prospective
Sector
Water Supply and Storage, Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)
Location
Cavendish, Prince Edward Island, Canada
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Route 13 Cavendish 2020

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Route 13 Cavendish 2020” is an infrastructure initiative in the Water Supply and Storage sector, located in Cavendish, Prince Edward Island, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Removing approximately 525 metres of existing boardwalk, and constructing approximately 730 metres of active transportation (AT) trail, installing 360 metres of storm sewer along east side of road, and widening approximately 730 metres of existing roadway. The construction shall also include; earth excavation, placing select borrow, placing granular A, placing asphalt seal: B (85 mm) for 2.4 metre wide AT trail, cold planing 2.4 metre strip along both sides of road (1.2 metres of asphalt and ...

Procurement method

Location

Country

Canada

State

Prince Edward Island

City

Cavendish

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project