Route 141 Improvement, St. Louis, Missouri

Closed · United States

Source: Road Traffic Technology

Project
Closed

Route 141 highway is located in the western St. Louis metropolitan area of Missouri, in the US. In February 2010, Fred Weber was awarded a $44.5m contract for the relocation of Route 141 between Ladue Road and Olive Boulevard. Route 141 is located in the western St. Louis metropolitan area of Missouri, US. A project to relocate the highway to the east of the existing route 141 and improve the road

Status
Closed
Sector
Automotive, Cement, Fertilizers, Government, Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Residential, Road, Power Generation (CCGT), Manufacturing (Industrial)
Location
United States of America
Updated
22 Jul 2026
Source
Road Traffic Technology

ConstructChat

Ask ConstructChat about Route 141 Improvement, St. Louis, Missouri

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Route 141 Improvement, St. Louis, Missouri” is an infrastructure initiative in the Automotive sector, located in United States. Taiyo aggregates data on it from Road Traffic Technology.

Participants

Sponsoring Agency

Company

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Route 141 highway is located in the western St. Louis metropolitan area of Missouri, in the US. In February 2010, Fred Weber was awarded a $44.5m contract for the relocation of Route 141 between Ladue Road and Olive Boulevard. Route 141 is located in the western St. Louis metropolitan area of Missouri, US. A project to relocate the highway to the east of the existing route 141 and improve the road between Ladue Road and Olive interchanges was initiated in spring 2010. It is expected to be completed by September 2012. The highway is maintained by Missouri Department of Transportation (MoDOT). Route 141 was built in the 1930s. More than 23,000 cars pass daily through the two-lane road stretch between Ladue Road and Olive. The traffic volume on the road stretch is expected to be increased by 35% during the next 20 years. Moreover, accident rates on the road have doubled. In the 1990s, the MoDOT initiated a study to review the three best alternatives for the relocation and improvement of the existing Route 141, between Olive Boulevard and Ladue Road. The study proposed relocating the existing Route 141 to the east of the current location and turning the current Route 141 into an extension of Old Woods Mill Road. The proposal was made after considering issues, such as overall cost, environmental impacts and residential and business impacts. It was concluded as the best option to improve congestion, increase the safety and deal with flooding issues. It also improves the traffic flow to the subdivisions and Parkway Central. The relocated Route 141 can be accessed at Olive Boulevard and Ladue Road interchanges. The project received environmental assessment approval from the Federal Highway Administration in December 2002. The Missouri Highway and Transportation Commission approved the preliminary design of the $65m the Route 141 improvement between Ladue Road and Olive in January 2009. The project was also approved by the East-West Gateway Council of Governments and construction began in March 2010. The project broke ground for construction in March 2010. The utility relocations were completed in 2009 and construction contracts were awarded in February 2010. The construction includes the creation of a six-lane highway and the construction of new interchanges at Ladue Road and Olive Boulevard. The construction is divided into six stages. Currently construction crews have restored five traffic lanes and the speed is limited to 30kmph along the Olive Boulevard work zone. The existing route 141 will become an extension of Old Woods Mill Road. Crews are using a photo-catalytic additive of titanium dioxide after laying down the concrete layer. The additive absorbs smog by using sunlight and releases it as nitrogen and carbon dioxide gases. In June 2009, Jacobs Engineering Group was awarded a $5m contract to provide final and post-design services to the preliminary and right-of-way design for the improvements. In February 2010, Fred Weber was awarded the construction contract for the project. The contract is valued at $44.5m. Fred Weber was also awarded a $10m contract to complete Sewer District upgrades along the Route 141 project. In September 2010, Fred Weber reached a partnership agreement with the Occupational Safety and Health Administration (OSHA), the US Department of Labour for the co-operative programme to promote on-site job safety at the Route 141 project. The total cost of the project is estimated to be $65m. MoDOT allocated $44.5m funding for the project under the American Recovery and Reinvestment Act. The East-West Gateway Council of Governments contributed $20m for the project.

Original sector

Transportation

Location

Country

United States of America (USA)

Source

Source reliability

High

Source

Road Traffic Technology

URL

More Details

Record type

Project

Sector

Automotive, Cement, Fertilizers, Government, Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Residential, Road, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2023-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project