Route 158 Development
One of 10,000+ projects Taiyo tracks in Quebec.
Source: Dodge USA
The project aims to strengthen road safety in addition to improving traffic flow on this highway between Saint-Alexis and Joliette. It consists of a redevelopment of this portion of Route 158, which will have four lanes with a physical separator and an interchange, at the intersection of Route 343, in Saint-Paul.
- Status
- Prospective
- Sector
- Road, Government, Commercial, Manufacturing (Industrial)
- Location
- Joliette, Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Route 158 Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project aims to strengthen road safety in addition to improving traffic flow on this highway between Saint-Alexis and Joliette. It consists of a redevelopment of this portion of Route 158, which will have four lanes with a physical separator and an interchange, at the intersection of Route 343, in Saint-Paul. |
Budget |
Location
Country | Canada |
State | Quebec |
City | Joliette |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
