logo
ProjectPlanned

Route 179 Bridge Deck Replacement

Sector: Bridge • Location: Centertown, Missouri, United States

Source: Hoodline

Replacement of the bridge deck on the Route 179 bridge over Rock Creek in Cole County. The bridge, built in 1936, has a structurally sound frame but requires repair of the driving surface. The project involves closing Route 179 during construction with detours in place.

Status
Prospective
Sector
Bridge, Road, Government
Location
Centertown, Missouri, United States of America
Updated
22 Jul 2026
Source
Hoodline

ConstructChat

Ask ConstructChat about Route 179 Bridge Deck Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Route 179 Bridge Deck Replacement” is an infrastructure initiative in the Bridge sector, located in Centertown, Missouri, United States. Taiyo aggregates data on it from Hoodline.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement of the bridge deck on the Route 179 bridge over Rock Creek in Cole County. The bridge, built in 1936, has a structurally sound frame but requires repair of the driving surface. The project involves closing Route 179 during construction with detours in place.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Missouri

City

Centertown

Source

Source

Hoodline

URL

More Details

Record type

Project

Sector

Bridge, Road, Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project