Route 18 Bridge Preservation over Big Beaver River
Sector: Bridge • Location: Beaver Falls/New Brighton, Pennsylvania, United States
Source: Pittsburgh Post-Gazette
Preservation of the Route 18 bridge over Big Beaver River in Beaver Falls and New Brighton. The $12 million-$14 million project begins summer 2026 and lasts through December 2028, including deck overlay, joint replacement, painting, lane restrictions, and southbound sidewalk closure with shuttle bus for pedestrians.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Preservation of the Route 18 bridge over Big Beaver River in Beaver Falls and New Brighton. The $12 million-$14 million project begins summer 2026 and lasts through December 2028, including deck overlay, joint replacement, painting, lane restrictions, and southbound sidewalk closure with shuttle bus for pedestrians. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
