logo

Route 18 East Brunswick, Drainage & Pavement Rehabilitation

Sector: Bridge • Location: New Jersey, United States of America

Source: New Jersey Department of Transportation (NJDOT)

Project
Active

Route 18 is a heavily traveled commuter and commercial corridor in East Brunswick Township, Middlesex County, New Jersey. There are three travel lanes in each direction and no shoulders, a multitude of right-in/right-out connections to driveways and intersecting streets, nine signalized intersections and two closely spaced interchanges at Cranbury and Milltown roads. There are jughandle ramps at e

Project Information FAQ

Project Information

4 Q
The project “Route 18 East Brunswick, Drainage & Pavement Rehabilitation” is an infrastructure initiative in the Bridge sector, located in New Jersey, United States of America. Taiyo aggregates data on it from New Jersey Department of Transportation (NJDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Route 18 is a heavily traveled commuter and commercial corridor in East Brunswick Township, Middlesex County, New Jersey. There are three travel lanes in each direction and no shoulders, a multitude of right-in/right-out connections to driveways and intersecting streets, nine signalized intersections and two closely spaced interchanges at Cranbury and Milltown roads. There are jughandle ramps at each signalized intersection. The improvements under the Route 18, East Brunswick, Drainage and Pavement Rehabilitation Project will rehabilitate pavement and improve drainage along Route 18 from milepost 35.40 to milepost 39.54 in East Brunswick, as well as at the Cranbury and Milltown roads interchanges. Additional improvements included in the project are as follows: Connection of sidewalks along with associated curb ramp and driveway improvements throughout the corridor Operational enhancements at the Edgeboro Road/Old Bridge Turnpike and Tices Lane intersections, including pedestrian/bus access View of Route 18 looking north from Milltown Road overpass, Milepost 37.3 Traffic signal improvements to meet current standards and Americans with Disabilities Act (ADA) requirements Guide rail and barrier improvements to meet current Manual for Assessing Safety Hardware (MASH) compliance standards Upgrades to existing utilities. The NJDOT awarded a contract for construction of the project to Earle Asphalt Company in June 2022. Construction activities commenced in January 2023, with substantial project completion anticipated in summer 2026. NJDOT About NJDOT About - Home

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data