Route 2 - Fortune Bridge
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work includes: Cold planing asphalt (50mm 15mm), placing asphalt levelling A (55mm) placing asphalt seal B (45 mm), curb removal, placing concrete curb, shouldering; landscaping and all other work necessary to complete the Contract. This project commences at the intersection of Route 2 and Route 308 (St. Charles Rd) and proceeds westerly along Route 2 for 1,600 meters
- Status
- Closed
- Sector
- Bridge, Cement, Road, Commercial
- Location
- Souris, Prince Edward Island, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Route 2 - Fortune Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes: Cold planing asphalt (50mm 15mm), placing asphalt levelling A (55mm) placing asphalt seal B (45 mm), curb removal, placing concrete curb, shouldering; landscaping and all other work necessary to complete the Contract. This project commences at the intersection of Route 2 and Route 308 (St. Charles Rd) and proceeds westerly along Route 2 for 1,600 meters |
Procurement method | |
Budget |
Location
Country | Canada |
State | Prince Edward Island |
City | Souris |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Cement, Road, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
