logo

Route 205 Bridge Repairs

Sector: Road • Location: King George County, Virginia, United States

Source: Virginia Department of Transportation (VDOT)

Project
Under Construction

Ridge Road is reduced to one lane beginning at the bridge over Rosier Creek for repairs. A temporary traffic signal directs one-way, alternating traffic on Route 205. This traffic pattern is in place through mid-February 2025.

Status
Under Construction
Sector
Road, Bridge
Location
King George County, Virginia, United States of America
Updated
22 Jul 2026
Source
Virginia Department of Transportation (VDOT)

ConstructChat

Ask ConstructChat about Route 205 Bridge Repairs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Route 205 Bridge Repairs” is an infrastructure initiative in the Road sector, located in King George County, Virginia, United States. Taiyo aggregates data on it from Virginia Department of Transportation (VDOT).

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ridge Road is reduced to one lane beginning at the bridge over Rosier Creek for repairs. A temporary traffic signal directs one-way, alternating traffic on Route 205. This traffic pattern is in place through mid-February 2025.

Location

Country

United States of America (USA)

State

Virginia

City

King George County

Source

Source

Virginia Department of Transportation (VDOT)

URL

More Details

Record type

Project

Sector

Road, Bridge

Article published date

2025-02-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project